The Erb Memorial Union will be closed for construction Aug. 5 through Aug. 16. During that time, access to the building is limited to those who work in the building.
Construction will focus on heavy demolition at the Fishbowl terrace and ballroom terrace, both located along University Street.
The area around the Fishbowl will smell strongly of tar and asphalt for much of August due to the construction. The Fishbowl Terrace will be roofed and waterproofed starting on Aug. 10 and last about a week. After the Fishbowl, roofing on the the ballroom terrace will continue until Aug. 28.
The Holden Leadership Center on the first floor of the building will be inaccessible Aug. 5 through Aug. 8.
Follow Noah McGraw on Twitter: @mcnoahmcgraw.